About LaborexRail

Global player in railway cleaning, metro and LRT

 

The last decades, our know-how and service has made us into a global player in the railways, metro and LRT. For over 50 years, we are internationally active in the railways, metro and LRT. Being innovative is of paramount importance to us. The package that we offer you is complete, our experience in railway cleaning very high. 

railway cleaning   Global player in Railway Industry   LaborexRail Railway cleaning solutions   

Click on a picture to enlarge

Always a ready-made solution

The package that we offer you is complete, experience very great. Each cleaning problem is different and requires an individual approach. Together with you we decide the most suitable cleaning system for your application.

We do not stand still and think forward together with our Engineering so better and more efficient cleaning systems can be developed whereby the correct chemistry and less water consumption are central.

Team of 80 qualified employees

Our modern, state of the art factory covers some 8000 m² including a steel plate department, the latest hi-tech machinery and a professional after-sales and service department. Our 80 qualified employees guarantee the perfect finish to your railway wastewater system, railway blasting cabinet and industrial parts cleaning system. This is where the strength of our entire organization lies.

Strong organisation

Laborex covers an area of 8,110 m² and is divided into following departments:

  • Management
  • Personnel Department, Accounting Department, Secretariat
  • Sales 
  • Engineering 
    • Mechanical Engineering, Electric Engineering
  • Production 
    • Production manager, Purchasing manager, Warehouse, Welding Department, Mounting
  • Plate Department
  • Outdoor technicians
     

   The strength of our entire organization   Team of 65 qualified employees  

​​Click on a picture to enlarge

Engineering

First, our Mechanical Engineering team create a 3D model in SolidWorks of what the railway wastewater system, blasting cabinet or cleaning system will look like. This model is extensively discussed with you and further tailored to your needs. In the mean-time, our Electrical Engineering team examines the full electric and automation process. The electric schemes and cabinet lay-out are drawn and designed. The PLC programs are written and tested. 

3D model in SolidWorks of how the machine/system will look   The full electric and automation process

           Mechanical Engineering                                  Electrical Engineering

Click on a picture to enlarge

Production 

After we have determined the complete engineering process, all materials are ordered and production can start. We have a team of highly skilled welders and technicians. All these people have the most modern equipment to achieve a high quality product. For example, all machines are built on a special 100% horizontal welding floor. After production, the machine is tested on the welding floor and connected to a test control box. When the machine runs satisfactorily, it is dismounted and then lacquered. The final assembly takes place in our Assembly Department.

All machines are built on a special 100 % horizontal welding floor   A team of highly skilled welders and technicians   The final assembly in our assembly Department

Click on a picture to enlarge

After-sales service

Even after the purchase of your railway machine, we continue to follow up. We have a permanent team available for delivery and installation of your railway machine. In addition, another team provides professional maintenance. Our qualified technicians undergo training on a regular base.

We have a permanent team for delivery and installation of all equipment   Qualified technicians   Professional maintenance

Click on a picture to enlarge

Parts warehouse

Having a strong after-sales service is one thing, having the right parts in stock another. We have a large warehouse where over 4,000 parts are in stock. Should something fail on your railway wastewater system, railway blasting cabinet or railway cleaning system, you can count on your machine being back in service within 24 hours. In certain circumstances or emergencies, bridging machines can be placed to keep your production running.

Parts warehouse   A large warehouse where ± 4,000 parts are in stock

Click on a picture to enlarge

Our own laboratory

In our laboratory we have several analytical equipment tools. This allows us to develop very specific cleaners tailored to the customer. In our laboratory the following techniques are available:

  • Ion chromatography
  • Gas chromatography
  • High-pressure liquid chromatography
  • Infrared spectroscopy
     

These techniques allow us to perform very accurate concentration measurements.
Due to our years of knowledge and experience, we have built a large range of industrial cleaners.

We have different analytical equipment   Very accurate concentration measurements

Click on a picture to enlarge

  • 35
    disposal network systems for train maintenance
  • More than 20 machines for RATP
  • 15
    years of collaboration with Dutch Railways
  • Over 20 workshops equipped

Hagelberg 15 - Industriezone 3 "De Heze" - B-2250 Olen - Belgium
[email protected]
Linkedin Twitter